I can't say how relieved we are to have had the house retarped, so grateful to the guys who did it.
The roofing company told us when we signed the contract that the start date would be from 2-4 weeks with a tentative starting date of 11/16. I'm thinking it'll be after that, as the weather would have had to slow them down a few days or so. Then we need the ceiling drywall taken down and replaced, textured and painted. And the insulation in the attic taken out and replaced. And somewhere in there, the attic checked for mold.
I'm ready for it to be done.
Responses
« Back to index | View thread »