Posted by Ray on 23/6/2006, 8:16 pm
213.122.9.3
There have been loads of new features to the ground in pre-season plus more to follow.
Currently the clough hall end stand is now the full width of the pitch.
The Beer Garden is fully enclosed with seating plus decking to the rear of the clubhouse.
The pitch has had new drains plus been reseeded.
The Kitchen now has a new entrance plus seating to be installed.
There has been a training pitch installed behind the clough hall end which also has floodlights.
The Stan Brown Stadium is under major change.
Message Thread:
![]()
« Back to thread